Classroom update
- Category: Kisarawe School Project
- Created: 27 June 2021
- Hits: 1819
Classroom block 2
Block 2 had been build and roofed but was waiting on the finishing’s. In February of 2021 this was finished. The windows and doors were fitted, walls plastered and painted and the floor filled and smoothed. Block 2 contains 3 rooms, of which one is designated for the library and the other two for science laboratories. One for physics, which will also be used for training in electrical installation and the other for chemistry and biology.